Foley & Lardner LLP

Experience

    Filters applied:

    Search phrase entered:

      • Biomass Plant Conversion Claim

      • Representing an ENR Top 100 contractor in claims following termination of a demolition subcontractor. The issues involve numerous safety violations and performance...
      • Ring Building Asbestos Remediation

      • The Ring Building, Washington DC: represent the owner in various disputes with contractor and tenants regarding asbestos remediation and build-out of tenant spaces.
      • City of Tarpon Springs Bid Protest

      • Protest of recommended award on $37 million alternative water supply project. The basis of the protest was the non-responsiveness of the apparent low bid. ...
      • Lee County Bid Protest

      • Protest of disqualification of client’s proposal on $60 million construction management contract for water treatment plant expansion. As a result of protest,...
      • Real Estate Portfolio Analysis

      • Led a team of Foley professionals in the evaluation of trailing liability construction defect exposure of more than 100 properties in 16 states, including...
      • Development of Cumulative Impact Claim

      • Represented a worldwide leader in architectural, engineering, planning and construction services in the development of a major claim measuring the cumulative impact...
      • Orange County Bid Protest

      • Protest of recommended award to apparent low bidder on underground utility project. Basis of protest was the apparent low bidder’s lack of requisite experience. ...
      • 100 MW Wind Farm Litigation Resolved

      • Represented the prime contractor in litigation arising from construction of a 100 megawatt wind farm consisting of 80 towers located on environmentally sensitive,...